Monday, December 10, 2012

Kitchen Crashers..Phase 3

Phase 3 has started!! Phase 3 is going to be the painting of the left side of the kitchen cabinets. Plus, we are extending the fridge enclosure to accomodate the depth of our fridge. We are also adding paneling to the side of the enclosure and the sides of the end lower cabinets.  The cabinets that are above the fridge will be removed and that area will be opened up, panelled with distressed pallet wood, and trim and corbels will be added to the fridge surround.  The fridge surround will also be painted black (same as the island in Phase 1) and distressed.   SOO Excited!!! Here are some progress pics so far..

 
Added paneling to sides of cabinets

 


 



Removed doors and opened up space

Added corbels



 
 

No comments:

Post a Comment